Thoughtfully designed, beautifully built kitchens — cabinetry, counters, lighting and layout handled by one local crew.
A look at some of the kitchens we’ve recently remodeled throughout Kitsap County.



A kitchen lives or dies on the working triangle. We start with how you actually use the room — who cooks, where people gather, what never has a home — then set the layout, the island size, and the walkways around that.
From there the details get decided together: cabinetry and drawer configuration sized for what you own, counters and backsplash that suit the light, appliance placement that keeps doors from colliding, and task lighting over every surface you work on.
Then we build it — demolition, electrical and plumbing, cabinetry, counters and finish work handled by the same local crew from the first day to the final walkthrough.


New layout, cabinetry, counters, lighting and flooring — including wall removal and relocated plumbing or electrical when the plan calls for it.
Custom and semi-custom cabinetry, islands built for seating and storage, quartz and stone counters templated and installed to fit.
Backsplash and floor tile, under-cabinet and pendant lighting, hardware and paint — a full visual change without moving the layout.
Robert Lopez and Daniel Cook run every project personally — over 40 years of combined construction experience in Kitsap County.
We walk the space, talk through goals and budget, and take measurements.
Layout, cabinetry, materials and a clear written estimate before anything is torn out.
Demolition through cabinetry, counters and finish work, with the site cleaned up daily.
We review every detail together and handle anything left on the list.
Most full kitchen remodels run six to ten weeks on site once cabinetry is ordered and delivered. Counter, tile and lighting updates that keep the existing layout are usually two to three weeks.
It depends on the size of the kitchen, the cabinetry line, counter material, and whether walls, plumbing or electrical move. We give a written estimate after walking the space so the number reflects your kitchen rather than an average.
Not the kitchen itself once demolition starts, but most homeowners stay in the house. We help set up a temporary kitchen, contain dust, and protect flooring and walkways.
Yes. We coordinate cabinetry selections and lead times, then handle countertop templating and installation so the schedule lines up with the rest of the work.
Often, yes. If the wall is structural we bring in the right beam and hardware, pull the permit, and coordinate inspections as part of the project.
Bridge to bridge across Kitsap County — Bremerton, Port Orchard, Poulsbo, Bainbridge Island, Silverdale, Kingston, Hansville, Suquamish, Port Gamble, Indianola, Seabeck, Olalla, Southworth, and Manchester.
Tell us a little about your project and we’ll help you figure out the next step.
Cabinets set and leveled, counters templated, finishes last — the part of a remodel most homeowners never see.


